XigenElectric elevator cargo elevatorProtection settings

announcer:hp935HP175192871 release time:2024-08-27 11:46:51

and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed the landing door shall not be opened.

The net height of the landing door opening should not be less than 8m

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

Xigen.In addition, when adding hydraulic oil, as some hydraulic oil manufacturers will choose hydraulic oil with poor quality. Hydraulic oil such as hydraulic lifting platforms not only cannot have any effect on folding arm elevators, but also affects the working efficiency of folding arm electric elevators due to deterioration issues.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

.Secondly, for the replacement of hydraulic oil on the lifting platform, it can be replaced once a year. The hydraulic oil must be clean,XigenElectric vertical elevator, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.


XigenElectric elevator cargo elevatorProtection settings



Emergency manual valve: In case of power failure,XigenElectric pillar elevator, it can cause the car to descend to the nearest floor position and open the door

Electric elevators should be regularly maintained and cleaned. During maintenance and cleaning, the bracket should be supported to prevent the electric elevator from overturning. Electrical and hydraulic systems should be maintained by professional personnel; When the battery level display is less than 40%

Horizontal lead screw mechanical electricity

The cheapest.There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., and the production should meet the design requirements.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process and at this position, sticky,XigenElectric guide rail elevator, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.


XigenElectric elevator cargo elevatorProtection settings



The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

Scheme customization.Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear, deformation, and corrosion of steel wire ropes

Steel wire rope construction electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the lifting cage until it is approved by a professional

The L distance depends on the selected wall mount model.

Xigen.The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

When the landing door is closed, the full width of the lifting passage opening should be covered.

Use floor doors and cage door devices on construction sites where conditions permit.