ArlingtonSimple electric elevatorWhere is the main advantage of

announcer:hp935HP175192871 release time:2024-08-24 18:26:33

Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.

Arlington.The impact load can cause early wear,ArlingtonElectric spiral rod elevator, fracture, and fragmentation of mechanical structural components, as well as generate impact pressure in the hydraulic system, which in turn can damage hydraulic components, oil seals, and high-pressure oil

Double layer steel mesh: The diameter of the steel bars is 12mm, shallow foundation pit required, large stroke, stable operation, low noise, accurate positioning and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, which should cover the opening with its full width it can be stopped arbitrarily within the range of travel.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

Setting requirements: Each landing entrance should be equipped with a landing door, and should not open towards the lifting passage.


ArlingtonSimple electric elevatorWhere is the main advantage of



Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Electric lifting machinery, as an important product of social development in China, has a high social status and has now become an irreplaceable operational tool in our mainstream goods. The hydraulic pump station is the heart position of electric lifting machinery, which greatly tests the professionalism and attention of operators. It is our common responsibility to inspect it and ensure the daily use of machinery. Let's take a look at a few common sense issues: the manufacturer of electric elevators is to ensure the correctness of the power connection, and there should be no misconnection or leakage; Pay attention to cleaning work in daily life and do not allow stains to corrode it; When standing still, regular maintenance should be carried out to prevent the impact of rain and snow weather; Overloading is the first thing that operators must comply with; Iron Law&# quo;; The adjustment of the solenoid valve cannot be done arbitrarily and must be checked and certified by a professional organization; Especially when conducting outdoor operations under high temperatures, it is necessary to always pay attention to the abnormalities of the pump station; It is very normal for us to encounter some problems when using hydraulic boarding bridges, as long as these problems are not very serious, we don't have to worry too much. However, when there is a problem with the hydraulic boarding bridge, only a timely solution is the correct response. Below is an introduction to some common faults of the hydraulic boarding bridge and specific solutions: the hydraulic boarding bridge must be repaired while hanging and supporting the working platform of the lifting platform to avoid sudden descent of the lifting platform, causing unnecessary casualties; 2. Do not adjust the overflow valve arbitrarily. Because every component in the hydraulic system operates at a specified pressure, once the relief valve is adjusted, it may cause abnormal operation of the hydraulic system, causing unnecessary damage to people machines, and objects; Non professional personnel are not allowed to disassemble electrical appliances at will to prevent electric shock or incorrect connection.

Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.

reform.The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

project.Use floor doors and cage door devices on construction sites where conditions permit.

High altitude operations and maintenance in areas such as repair, logistics, electricity, transportation, hotel, sports center, mining, and enterprise. The lifting system of the lifting platform is driven by hydraulic pressure, also known as hydraulic lifting

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

Arlington.Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

The use of a lifting platform as a tool for storing performance blankets, soft scenery etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets,Arlington200 kg portable electric elevator, soft scenery, etc.