ArxanMobile electric elevatorHow to treat the construction of market regulations

announcer:hp935HP175192871 release time:2024-08-07 16:47:43

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications as specified in the above table.

Arxan.The stopper bearing of the mechanism is kept intact.

From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life, large load bearing capacity, making them suitable for use in stage equipment.

.Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.


ArxanMobile electric elevatorHow to treat the construction of market regulations



The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

Before installing the construction electric elevator, the foundation should be inspected and approved before installation.

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

The cost is reasonable.Setting requirements: The wall bracket should use the manufacturer's matching standard products.

A complete lifting platform accessory can be selected and customized according to different places, venues, and environmental usage conditions. Meet the needs of different users. So why lifting platforms can be used and installed in so many industries and places is because they can achieve multi-purpose, demonstrate multifunctional, meet various different needs, and win market demand. In modern industrial transportation processes, lifting platforms have begun to play an increasingly important role, whether in airports, docks, floors, workshops and other places that require rapid loading and unloading of goods, they have played a very practical value, It has also brought great contributions to the entire industry and even the entire economic development. However, long-term operation and use of these devices inevitably lead to wear and consumption, and regular maintenance and upkeep are essential. Otherwise, both work efficiency and utilization rate will decrease, and at that time, the gains and losses will outweigh the losses.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.


ArxanMobile electric elevatorHow to treat the construction of market regulations



News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years,ArxanGuide rail electric elevator, the products of electric lifting platform vehicles have been continuously improved and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

Bidding.Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), family dormitories,ArxanSmall electric mobile elevator, and

Mobile electric elevators are divided into: four wheel mobile lifting platform, two wheel traction lifting platform, car modified lifting platform, manual lifting platform, manual lifting platform, and AC/DC dual purpose lifting platform

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.

Arxan.The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

Installation verticality deviation guide rail frame erection height, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.