Nuo8 meter electric elevatorIntroduction to the preparation work that needs to be done before homework

announcer:hp935HP175192871 release time:2024-08-07 14:54:01

NuoElectric elevator lifting 10 meters,NuoElectric aluminum alloy elevator,

Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, shallow foundation pit required, large stroke, stable operation low noise, accurate positioning,NuoPortable electric elevator, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, it can be stopped arbitrarily within the range of travel.

Construction electric elevators outside the lightning protection range

Nuo.Steel wire rope construction electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the lifting cage until it is approved by a professional

When the foundation is set on the roof or floor structure, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level timely inspection of various functions is essential.

We have all purchased the aluminum alloy electric elevator equipment, which is compact and easy to carry. Many garden style hotels, airports, and large parking lots also wear this equipment,

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Test results.Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).


Nuo8 meter electric elevatorIntroduction to the preparation work that needs to be done before homework



The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

Statistics.When the wall bracket adopts non matching standard products, design calculations should be carried out.

Requirements for the operation platform of the construction lowering machine and the setting of the brake reset emergency stop switch: The shutdown device (emergency stop switch) should be able to stop or maintain the electric elevator (including the power driven door) in a non working state

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Nuo.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

Setting requirements: The landing door should be standardized and tooled.