Taurier1000kW dry type transformerImprove product innovation ability

announcer:hp122HP117294921 release time:2024-08-04 14:56:08

TaurierLatest standard for dry type transformer,

The raw materials of Fushi blue can be used for bonding,TaurierOil immersed distribution transformer, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, the dispersion spacing and adverse effects are very large.

Taurier.Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches 155 ℃,TaurierPower system transformer, the system software outputs the overtemperature alarm system; If the temperature rises to 170 ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, and the transformer shall be tripped quickly.

Seal oil leakage

.The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, so as to reduce the working pressure and leakage. After the leakage location is determined appropriate surface treatment shall be carried out, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device and then Fushi blue raw materials shall be selected for sealing treatment.

On load commissioning:


Taurier1000kW dry type transformerImprove product innovation ability



Analysis of common faults of oil immersed transformer:

The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.

Sound in case of phase failure

equipment maintenance .Oil immersed transformer operation

Oil leakage at looper flange

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.


Taurier1000kW dry type transformerImprove product innovation ability



Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.

Job description.Power transformer

This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

Power transformers are used in all walks of life

Taurier.Oil immersed transformer

On load commissioning:

The noise of dry-type transformer comes from