After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:

Busselton.It is understood that in China, transformers have experienced the whole process of replacing many series products such as sss11. As early as the middle and late 1980s, S7 Series lossless distribution transformers were selected in China to replace the high energy consumption transformers of jb1300-73 and jb500 - Specifications operating in the power network at that time. Since the 19th century,BusseltonDry type 1250kva transformer, urban power grids have been transformed all over the country, S13 and S15 commodities are gradually selected in large quantities in the transformation of urban and rural power networks in China, and their full load loss is 50% - 80% less than that of S9 transformer.

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.

Oil immersed transformer operation

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, according to the magnetic induction line of the transformer ferrite core, its orientation and size change with the change, which promotes the internal molecular structure of the ferrite core to interact with each other, releases energy, and then loses part of electromagnetic energy, which is the hysteresis loss. The other is the vortex loss when the transformer is working.

Operation of oil immersed transformer

where.It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires coil inductance process of various ways of electromagnetic coil, solution process and quality standard,Busselton110 kV oil immersed transformer, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

In the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.

The switching power supply lacks one phase of power;


BusseltonDistribution transformer quotationQuality record control procedures



The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and D (or D) is triangular wiring.

Project scope.After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

The fundamental reason for this kind of inaccuracy is that when the transformer & ldquo; Dalar trolley & rdquo; is considered according to the size of capacity utilization rate, the high-capacity transformer must be replaced by the small-capacity transformer with high utilization rate,BusseltonCapacity specification of 10kV power transformer, and then the iron loss is considered and the copper loss is ignored. In fact, for a certain load, the active power loss of small capacity exceeds that of large capacity The active power loss of the transformer, so it consumes electromagnetic energy.

Plug in the power with full load first observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

Busselton.The voltage regulating tap changer is not in place or poor

Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).

Oil immersed transformer