SitaElectric pillar elevatorWhat factors in processing will cause deformation of the workpiece

announcer:hp935HP175192871 release time:2024-07-09 09:53:12

The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

Acceptance: Concrete strength grade C30, strength testing report.

Sita.The cargo is 0.5m.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

.Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

The landing door should meet the requirements of the specifications and achieve standardization.

Implementing multiple shifts of homework should fill in and submit records according to regulations.


SitaElectric pillar elevatorWhat factors in processing will cause deformation of the workpiece



Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

Non automatic reset upper and lower limit switches should be installed at both the upper and lower ends of the stroke, which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers),

When the landing door is closed, the full width of the lifting passage opening should be covered.

Variable cost.The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform,SitaSimple electric elevator, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out so that the entire platform does not have a height difference, ensuring the safety of the cast members.

The L distance depends on the selected wall mount model.


SitaElectric pillar elevatorWhat factors in processing will cause deformation of the workpiece



The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

Recommendation and consultation.The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

When using lifting equipment, the workbench should be kept in a horizontal state.

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Sita.The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

In order to meet the needs of contemporary audiences and achieve perfect effects, in addition to lighting and sound stage machinery is particularly important on the stage. On the stage, suspension points, lighting suspension cages, and fire curtains. Under the stage, there are lifting platforms car platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables,SitaSecond floor electric elevator, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, dance theaters, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage design and choreographers, creating special atmosphere and effects, and changing the stage form according to the needs of the performance.