Luancheng2 meter electric elevatorCommon sense of tool use

announcer:hp935HP175192871 release time:2024-07-06 09:26:34

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

Luancheng.Electric lifting machinery, as an important product of social development in China, has a high social status and has now become an irreplaceable operational tool in our mainstream goods. The hydraulic pump station is the heart position of electric lifting machinery which greatly tests the professionalism and attention of operators. It is our common responsibility to inspect it and ensure the daily use of machinery. Let's take a look at a few common sense issues: the manufacturer of electric elevators is to ensure the correctness of the power connection,LuanchengFully electric self-propelled elevator, and there should be no misconnection or leakage; Pay attention to cleaning work in daily life and do not allow stains to corrode it; When standing still, regular maintenance should be carried out to prevent the impact of rain and snow weather; Overloading is the first thing that operators must comply with; Iron Law&# quo;; The adjustment of the solenoid valve cannot be done arbitrarily and must be checked and certified by a professional organization; Especially when conducting outdoor operations under high temperatures, it is necessary to always pay attention to the abnormalities of the pump station; It is very normal for us to encounter some problems when using hydraulic boarding bridges, we don't have to worry too much. However, when there is a problem with the hydraulic boarding bridge, only a timely solution is the correct response. Below is an introduction to some common faults of the hydraulic boarding bridge and specific solutions: the hydraulic boarding bridge must be repaired while hanging and supporting the working platform of the lifting platform to avoid sudden descent of the lifting platform, causing unnecessary casualties; 2. Do not adjust the overflow valve arbitrarily. Because every component in the hydraulic system operates at a specified pressure, once the relief valve is adjusted, it may cause abnormal operation of the hydraulic system causing unnecessary damage to people, and objects; Non professional personnel are not allowed to disassemble electrical appliances at will to prevent electric shock or incorrect connection.

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.


Luancheng2 meter electric elevatorCommon sense of tool use



Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Before installing the construction electric elevator, the foundation should be inspected and approved before installation.

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

High quality brand.The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

During the use period,LuanchengNiuli brand electric elevator, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs etc.


Luancheng2 meter electric elevatorCommon sense of tool use



The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

Lets see.Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, the handover system should be implemented,LuanchengFixed electric elevator, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Luancheng.The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.