MahbraS13 oil immersed transformerProduct classification related knowledge

announcer:hp122HP117294921 release time:2024-07-05 13:31:11

Falling foreign matters and piercing

When using the oil sample of the power transformer in operation, and then take the oil sample.

Mahbra.How to make up oil for oil immersed transformer?

Oil immersed transformer operation

.When sampling in bulk gasoline barrels, samples shall be selected according to 5% of the number of gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

Operation and maintenance management of oil immersed transformer

Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.


MahbraS13 oil immersed transformerProduct classification related knowledge



The switching power supply lacks one phase of power;

How to maintain dry-type transformer?

Power transformer factory

Quality assurance.The power transformer belongs to relatively durable electrical equipment and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:

The hanging core of dry-type transformer is a vital part

The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).


MahbraS13 oil immersed transformerProduct classification related knowledge



The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

install.Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank,MahbraHow much is a 250kVA box transformer, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process,MahbraDry type transformer ranking,MahbraWhat are the oil immersed transformer protections, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.

The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, so the usual load is 200 KW, CST = 0. One 750kva transformer was originally configured and the capacity utilization rate introduced by the transformer manufacturer is only 34%

Careless maintenance and insulation damage

Mahbra.If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

Manufacturing process and steps of dry-type transformer

When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.