ColumbusElevator electric microMultiple measures to ensure the fulfillment of the contract

announcer:hp935HP175192871 release time:2024-07-02 12:41:05

ColumbusManned electric elevator,

Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.

Setting requirements: The landing door should be standardized and tooled.

Columbus.The suspension cage movement can only be resumed after operator operation.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station and the landing doors should function properly.

.The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position


ColumbusElevator electric microMultiple measures to ensure the fulfillment of the contract



Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

Correct use can also greatly improve work efficiency. So how should it be used?

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Design brand.Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.


ColumbusElevator electric microMultiple measures to ensure the fulfillment of the contract



The use of standard section connecting bolts should comply with the user manual and specification requirements.

recommend.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, and at this position,ColumbusElectric cargo elevator, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel,ColumbusElectric belt elevator, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

How to determine the sufficient amount of clean oil for the hydraulic station of an electric elevator? Why cannot water be used to flush the hydraulic station of an electric elevator?

Acceptance: Concrete strength grade C30, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).