Palais de Versailles10 ton lifting cargo elevatorHow to carry out numerical control transformation

announcer:hp779HP136589660 release time:2024-07-01 10:16:09

The brake operators of each mechanism on the equipment should regularly check and adjust the clearance of the brake shoe and brake wheel, a 20 year old brand with competitive prices and guaranteed quality!

The motor winding is short-circuited. When a short circuit fault occurs in the motor winding, the short circuit current is much larger than the normal working current, which increases the copper loss of the winding, can cause the motor to burn out.

Before installing the elevator and in severe cases, confirm whether the motor and the elevator are intact, and strictly check whether the dimensions of each part connecting the motor and the elevator match. Here are the dimensions and fit tolerances of the positioning boss, and elevator groove of the motor.

.Precautions for elevator installation: Keep the access road of external construction elevators smooth and have sufficient space for parking equipment. When using a steam crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the steam crane.

Walking: assisted self-propelled, two wheel traction, self driving, and car modification.

Hydraulic pump station: domestic lifting platform dedicated pump station, mesh type, and iron plate sealed type.


Palais de Versailles10 ton lifting cargo elevatorHow to carry out numerical control transformation



Prepare the foundation according to the foundation plan, pay attention to alignment, leveling, and alignment, and ensure the level of the foundation and various usage requirements.

Many times, when ordering a large lifting platform, after the customer has determined the parameters, the designer will first consider various factors before designing, including the size during transportation, to prevent it from being difficult to transport to the customer's installation site after being too wide. Therefore, during design and manufacturing, it is necessary to consider separate assembly or table split to meet the requirements. At the same time, it is also necessary to consider the bearing capacity of the split design and manufacture on the premise of ensuring the load capacity and stability, lifted and ensure that the equipment can be easily transported, and moved.

The load of this series of products is divided into 0.1 to 0.8 tons, and can also be customized according to user requirements, with a load of up to 10 tons.

Recommendation and consultation.Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten with the hexagon socket. After that, remove the motor shaft key.

What types of elevators are there? There are many types of such equipment, such as fixed lifting devices and vehicular lifting devices, depending on the form of movement. The so-called fixed lifting is generally installed in one place and fixed, and then lifting operations can be carried out. This type of lifting equipment is generally used more on the assembly line, and some large production lines need to lift the materials to a certain position when loading them, and then put them into production on the production line. A special lifting device needs to be fixed at a certain position on the production line.

Secondly, there should be no dirt on the friction surface. If there is any dirt, it should be washed off with gasoline or thinner; The reduction gearbox, gearbox, external meshing gear, and other parts of the equipment as well as the hydraulic oil, must be tested according to the requirements in the table; Correct maintenance of the hydraulic guide rail elevator: Regularly inspect the wire ropes at various parts for broken wires and looseness. If any such phenomenon is found, replace it in a timely manner. The maintenance of the wire ropes must be carried out in strict accordance with the specifications; Check the connection condition of each part according to the braking rules and regulations. If there is any looseness, tighten it in a timely manner. Check the tightness of the connecting bolts of the equipment when the body is under pressure. All connecting shafts should be equipped with cotter pins; Check whether the operation of each mechanism is normal, whether there are noises and faults according to regulations, and promptly remove all faults; When installing, disassembling, and adjusting the rotating mechanism of the equipment, it is important to note that the reducer and the gear center line should be parallel, and the meshing clearance should be appropriate; Regularly conduct a comprehensive inspection of the equipment to see if there is any damage to the wires and cables, and if there is overheating of the motor. Replace the motor in a timely manner and eliminate the fault before continuing operation; Ensure that the bearings, boxes, distribution boxes, and brushes of the motor are kept clean, and that the travel switch points of each safety device must be safe and reliable.


Palais de Versailles10 ton lifting cargo elevatorHow to carry out numerical control transformation



Secondly, there should be no dirt on the friction surface. If there is any dirt, it should be washed off with gasoline or thinner; The reduction gearbox, external meshing gear, and other parts of the equipment, as well as the hydraulic oil, must be tested according to the requirements in the table; Correct maintenance of the hydraulic guide rail elevator: Regularly inspect the wire ropes at various parts for broken wires and looseness. If any such phenomenon is found,Palais de VersaillesGuide rail type simple lifting cargo elevator, replace it in a timely manner. The maintenance of the wire ropes must be carried out in strict accordance with the specifications; Check the connection condition of each part according to the braking rules and regulations. If there is any looseness, tighten it in a timely manner. Check the tightness of the connecting bolts of the equipment when the body is under pressure. All connecting shafts should be equipped with cotter pins; Check whether the operation of each mechanism is normal, whether there are noises and faults according to regulations, and promptly remove all faults; When installing, disassembling, and adjusting the rotating mechanism of the equipment, it is important to note that the reducer and the gear center line should be parallel, and the meshing clearance should be appropriate; Regularly conduct a comprehensive inspection of the equipment to see if there is any damage to the wires and cables, and if there is overheating of the motor. Replace the motor in a timely manner and eliminate the fault before continuing operation; Ensure that the bearings, boxes, distribution boxes, and brushes of the motor are kept clean, and that the travel switch points of each safety device must be safe and reliable.

Inspection basis.Purpose The hydraulic lift is widely used in various industrial enterprises and production lines such as automobile, container, wood processing, chemical filling, etc., to meet the lifting requirements of different operation heights, and can be equipped with various table forms (such as ball, roller, turntable,Palais de VersaillesElectric cargo elevator, steering, tipping, telescoping), and with various ways (separate, linkage, explosion-proof), it has the characteristics of stable and accurate lifting frequent starting, and large load capacity, Effectively solve various lifting and lowering operation difficulties in industrial enterprises, making production operations free. Professional elevator factory has advanced technology, strict testing, more affordable prices, and more preferential treatment. Welcome to consult

The transportation lifting platform only needs

Connect the motor to the elevator naturally. During connection, it must be ensured that the concentricity of the elevator output shaft and the motor input shaft is consistent, and that the outer flanges of the two are parallel. Inconsistent centering can cause the motor shaft to break or the elevator gear to wear.

Palais de Versailles.In addition, it is strictly prohibited to use a hammer during installation to prevent excessive axial or radial force from damaging the bearings or gears. Be sure to tighten the mounting bolts before tightening the tension bolts. Before installation, clean the anti rust oil on the motor input shaft, positioning boss, and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation,Palais de VersaillesChain type cargo elevator, and to prevent unnecessary wear and tear.

When a cargo elevator fails, it should be repaired by professional personnel. It is not allowed to modify the cargo elevator without permission.