CloverProduction process of oil immersed transformerReasons for the increase in production

announcer:hp122HP117294921 release time:2024-06-28 16:41:44

Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined,CloverMaintenance specification for box type transformer, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.

Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.

Clover.Transformer inspection ear

Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire please be rational to make the oil immersed transformer safer and more efficient.

.Noise solution of dry-type transformer

Noise pollution control and prevention measures of dry-type transformer

According to the condition of cracks, it will lead to the scalding of solenoid coil, slow aging of insulation,CloverHow much is a 50 KVA box transformer, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by 100kW motor, so the usual load is 200 KW CST = 0. One 750kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only 34%

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, The resistor is generally more than 2000 & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

Installation works.Operation of oil immersed transformer

The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.

From the appearance the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;


CloverProduction process of oil immersed transformerReasons for the increase in production



Note: in the whole process of safety patrol inspection, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

Quality inspection report.When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,

The common dry-type transformer is an important electrical equipment, and the voltage is constantly regulated. However, because of certain necessity,Clover500 kV dry type transformer, the dry-type transformer will also boost voltage, and the whole process of boosting voltage is very complex, and there are many principles.

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a guardrail of no less than 7m shall be installed around it, and a warning sign shall be hung at a prominent position.

Clover.Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.

Note: in the whole process of safety patrol inspection, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.