Riverside SeineHydraulic fixed boarding bridgeHow is it made

announcer:hp161HP196399230 release time:2024-06-22 16:28:56

Common&quo; Streamline” Open joint planning, with a welding area more than three times that of other traditional pipeline joints, greatly extending the service life and protection life.

As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

Riverside Seine.(4) For the connection parts of the mobile boarding bridge, careful inspection should be carried out to check for any looseness, such as connecting bolts. If there are any, they should be tightened in a timely manner. In addition for all connecting shafts, there should be split pins that are thick and sufficient.

conduct.

.The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time,Riverside SeineTruck boarding bridge, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

It is strictly prohibited to apply excessive pile loads around the foundation pit.


Riverside SeineHydraulic fixed boarding bridgeHow is it made



The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

Usage environment: Able to adapt to specific working environments, such as working in highly corrosive, dusty, high-temperature, and low-temperature environments.

conduct.

For more, please check.The hydraulic lifting boarding bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other handling vehicles can directly enter the truck for batch loading and unloading of goods, and single person operations can achieve fast loading and unloading of goods. Reduce a large amount of labor, improve work efficiency, and achieve greater economic benefits for enterprises.

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories,Riverside SeineFixed hydraulic boarding axle, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers establish a spare parts warehouse for vulnerable and commonly used parts, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

The width of the boarding bridge also requires a certain width of its own. However, it is not conducive to forklift loading and unloading of goods. If the width is too large, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is 1800mm, 2000mm, and 2100mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.


Riverside SeineHydraulic fixed boarding bridgeHow is it made



The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Direct labor.  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

B) When maintaining the hydraulic system, only clean plastic plugs can be used to seal the ends of the pipeline.

Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering, it will not be able to be used, but now there are both manual and electric boarding bridges that are more convenient to use.

Riverside Seine.Slowly reverse and park the container under the lip at the front of the boarding bridge.

After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the relief valve gets stuck or severely worn,Riverside SeineFolding boarding bridge, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.