When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

Louisville.The impact load can cause early wear, fracture, and fragmentation of mechanical structural components, as well as generate impact pressure in the hydraulic system, which in turn can damage hydraulic components, oil seals and high-pressure oil

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

.Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear, deformation, and corrosion of steel wire ropes


LouisvilleElectric elevator lifting platformMechanical performance index analysis



Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

Check whether the sealing of components such as the oil cylinder, oil pipe, and motor of the aluminum alloy electric elevator is good and whether there is any air leakage.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Range.Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, for the replacement of hydraulic oil on the lifting platform it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil,Louisville3 meter small electric elevator,LouisvilleElectric elevators for construction sites, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

details.Setting requirements: The installation and dismantling workers, electricians,LouisvilleElevator electric platform, and other operators of construction electric elevators should have special construction operations.

When using lifting equipment, the workbench should be kept in a horizontal state.

The counterweight guide rail should meet the specification requirements.

Louisville.Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.