SeihbergMobile boarding bridgeJinjiu is approaching price fluctuations and rising

announcer:hp161HP196399230 release time:2024-06-19 16:03:53

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Seihberg.Staying below high-altitude work sites is prohibited, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.

Open planning before placement makes it easy to clean up clutter.

.When it comes to fixed hydraulic boarding bridges, causing air to enter the hydraulic oil and also producing high noise. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.


SeihbergMobile boarding bridgeJinjiu is approaching price fluctuations and rising



Open the manual valve, slowly lower the boarding bridge, and secure more than 90% of the lip plates at the bottom of the container.

The appearance of the hydraulic boarding bridge provided by Qiaolai to customers, and the demand for boarding bridges is also increasing. However, there are not many manufacturers of corresponding boarding bridges. Many boarding bridge companies are leather bag companies, and they do not produce them themselves, resulting in high prices. What is important is that they do not have a good understanding of the technology of car booths, and there are often deviations when passing on the technical requirements of direct customers to the manufacturers. Therefore, customers who purchase boarding bridges can directly find professional manufacturers. When choosing a boarding bridge, the first thing to consider is the range of use frequency of work, utilization, rated weight and other factors of the product, and choose a boarding bridge that is suitable for the requirements of the unit. Conduct market research based on the proposed technical parameters. The first condition for selecting a supplier is to consider the manufacturer of the boarding axle, and then the after-sales service capability. As long as it is a fixed boarding bridge with good product quality, excellent performance, and complete equipment, it can be chosen at a reasonable price. Long term promotion of axle manufacturer, with price advantages and guaranteed quality!

Open the manual valve, slowly lower the boarding bridge, and secure more than 90% of the lip plates at the bottom of the container.

Where is it.The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts,SeihbergContainer boarding bridge, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers,SeihbergMobile hydraulic boarding bridge, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

Embedded boarding bridge, as the name suggests, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.


SeihbergMobile boarding bridgeJinjiu is approaching price fluctuations and rising



For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

Safety and health.When the hydraulic oil is insufficient, the hydraulic pump will produce suction phenomenon, causing air to enter the hydraulic oil and also producing high noise. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

Features: Shear mechanical structure working height generally ranging from 6 meters to 14 meters, high stability after lifting the platform, wide working platform vehicle and high load capacity, wide range of high-altitude work, suitable for multiple people working simultaneously. The power form can be selected according to different requirements (such as three-phase AC power supply, DC power supply, and internal combustion power supply). The manual hydraulic device can lift and retract normally in places with power outage or no power supply, increase the telescopic platform car, and extend to necessary positions in case of insufficient length of the platform car, improving work efficiency.

The electronic operation is very simple. With just one button,SeihbergFixed hydraulic boarding bridge, the air conditioning panel will automatically rise. Release the button, adjust the plate to reduce itself, and the hinge is used on the truck.

Seihberg.Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

These are the options for hydraulic oil for mobile boarding bridges.

Tighten the manual valve to close it.