HornHydraulic lifting boarding bridgeWhy it becomes important in industrial process control

announcer:hp161HP196399230 release time:2024-06-19 14:50:25

During the application process of hydraulic boarding bridges it is necessary to follow the operating procedures to ensure the normal operation of the equipment. What precautions should we take when using hydraulic boarding bridges?

During use, and if there are any problems, the use should be stopped immediately.

Horn.On a moving steel structure slope,HornHydraulic boarding bridge, forklifts can also directly enter the interior of truck carriages for bulk loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

.The hydraulic boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods, malfunctions during use are inevitable. What should we do when encountering a malfunction?

  1. Before use,HornWarehouse boarding bridge, check the boarding bridge for obvious damage such as cracks and broken wires.

When the hydraulic oil is insufficient, the hydraulic pump will produce suction phenomenon causing air to enter the hydraulic oil and also producing high noise. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed,HornTrain boarding bridge, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.


HornHydraulic lifting boarding bridgeWhy it becomes important in industrial process control



Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.

There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.

Meticulous workmanship.Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.


HornHydraulic lifting boarding bridgeWhy it becomes important in industrial process control



Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.

Sincere service.For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air, or safety belts or ropes should be used.

When working in foundation pits or depths, a helmet must be worn.

Horn.When working in foundation pits or depths, a helmet must be worn.

There is a flip plate at the top of the bridge deck, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.