EssenElectric six meter elevatorSupplier welcomes you

announcer:hp935HP175192871 release time:2024-06-18 15:18:10

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form concealed engineering acceptance form,EssenElectric brick elevator, and concrete strength report.

Essen.The working principle of the aluminum alloy lifting platform is that hydraulic oil is composed of a vane pump to form a certain pressure, which enters the lower end of the hydraulic cylinder through an oil filter, hydraulic control one-way valve, and balance valve

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

.The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.


EssenElectric six meter elevatorSupplier welcomes you



News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged,EssenElectric mobile elevator, making the further development of lifting platform vehicles possible.

The shutdown device (emergency stop switch) should be non automatic reset type.

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

original.Protective measures should comply with regulatory requirements.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting,EssenScissor fork electric elevator, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.


EssenElectric six meter elevatorSupplier welcomes you



The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

analysis.When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

Equal effect.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

Essen.To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.