OstrovinkaElectric cargo elevatorWhat's the matter

announcer:hp935HP175192871 release time:2024-06-11 14:25:43

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

Ostrovinka.Stop.

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.


OstrovinkaElectric cargo elevatorWhat



Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower,OstrovinkaMultifunctional electric elevator, Pavilion; Ideal props.

Construction electric elevators should be equipped with lower limit switches that are sensitive and reliable.

Implementing multiple shifts of homework should fill in and submit records according to regulations.

Good quality.Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.


OstrovinkaElectric cargo elevatorWhat



According to the needs of different performance genres, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage an extended stage, an island stage, an intermediate stage, a T-shaped stage,OstrovinkaPlatform electric elevator, or a hall.

query.Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires,OstrovinkaElectric mobile hydraulic elevator, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

Pole

Use floor doors and cage door devices on construction sites where conditions permit.

Ostrovinka.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats etc.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.