Munich Lim AirportTractive mobile elevatorWhat principles should be paid attention to in the selection

announcer:hp275HP127226562 release time:2024-06-03 13:05:56

02 The lifting platform adopts a fully hydraulic lifting mechanism, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device, In order to ensure the safety of operators, each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands, and the power of the entire vehicle 09 is a diesel engine with its own power supply. The power supply can also be used. The hydraulic lifting platform is equipped with an emergency lowering device in case of power outage. The 11 folding arm lifting platform product can also use a 50Hz, 380V power motor, and diesel engine dual power.

Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

Munich Lim Airport.The lifting stage is a high-altitude operation equipment, and prolonged use can cause loose connections between some components. So in order to ensure the personal safety of construction workers, it is necessary to regularly inspect the lifting stage and tighten any loose components. The lifting stage is a high-altitude operation equipment, and prolonged use can cause loose connections between some components. So in order to ensure the personal safety of construction workers, it is necessary to regularly inspect the lifting stage and tighten any loose components. The interference and hazard analysis of the frequency conversion speed regulation construction elevator circuit is becoming increasingly widespread in the development of technology today. Variable frequency speed regulation has the characteristics of stable start and stop process, reducing mechanical shock, increasing the comfort of passengers, and improving the service life. At the same time, it can also change the speed of power supply frequency regulation, save electric energy, and improve work efficiency. However, there will be interference in the use of variable frequency speed regulation system, which will often cause safety accidents of construction elevator.

Heavy load capacity: protective plate form: 90° Or 180° Interchangeable configuration rocker working angle: 75° Drive method: hydraulic power unit drive or screw drive.

.Folding arm lifting platform product features 01 Folding arm lifting platform High altitude operation platform 360 degree rotation without external power supply, can work across obstacles, lifting smoothly and safely. The curved arm lifting platform adopts a curved arm working arm, and the scope and space of operation are not affected.

The selection of vibration pickup points refers to the placement point of the sensor, which is used to measure the vibration amplitude of the workpiece. According to GB/T25712-2010, and its testing direction should be adjusted to be perpendicular to the plane where the effective zone of the vibration mode is located. Considering the complex structure of the lifting foundation workpiece and the uneven thickness of each component, the vibration pickup point is set in a thick area in the middle of the component.

Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.


Munich Lim AirportTractive mobile elevatorWhat principles should be paid attention to in the selection



According to calculations, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore two support points should be taken on each side for time treatment.

When loosening occurs, due to alternating loads such as impact and vibration newly processed and assembled components have deviations in geometric shape and fitting dimensions. In the early stages of use, as well as factors such as heat and deformation, coupled with rapid wear and tear, it is easy to cause the previously fastened components to loosen.

The selection of vibration pickup points refers to the placement point of the sensor, which is used to measure the vibration amplitude of the workpiece. According to GB/T25712-2010, the acceleration sensor should be placed on the workpiece with a certain rigidity and a large amplitude, and its testing direction should be adjusted to be perpendicular to the plane where the effective zone of the vibration mode is located. Considering the complex structure of the lifting foundation workpiece and the uneven thickness of each component, the vibration pickup point is set in a thick area in the middle of the component.

supply.During aging treatment, the equipment prints the vibration aging curve online. According to the curve, the front end of the a-t curve shows an upward trend, indicating that the damping inside the component decreases after vibration treatment, so the amplitude gradually increases; Since then,Munich Lim AirportCar mounted scissor fork lifting platform, the amplitude change has been basically stable, indicating that the structure of molecules inside the component tends to be stable,Munich Lim AirportAluminum alloy single column lifting platform, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation, and hang it in a prominent position. When working on an electric lifting platform, professional drivers and operators must be equipped, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, zy12 drivers must carefully check the electrical, and mechanical systems of the platform, check the working range of the lifting platform truck, and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

During aging treatment, the equipment prints the vibration aging curve online. According to the curve, the front end of the a-t curve shows an upward trend, indicating that the damping inside the component decreases after vibration treatment, so the amplitude gradually increases; Since then, the amplitude change has been basically stable, indicating that the structure of molecules inside the component tends to be stable, which conforms to the judgment standard of curve observation strip, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation, and hang it in a prominent position. When working on an electric lifting platform, professional drivers and operators must be equipped, and they must undergo specialized training and be qualified. They must hold relevant certificates and take on corresponding responsibilities according to the actual situation of the work. After the construction is completed, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, zy12 drivers must carefully check the electrical, hydraulic, and mechanical systems of the platform, check the working range of the lifting platform truck, and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

Folding arm lifting platform product features 01 Folding arm lifting platform High altitude operation platform 360 degree rotation without external power supply, can work across obstacles, lifting smoothly and safely. The curved arm lifting platform adopts a curved arm working arm, and the scope and space of operation are not affected.


Munich Lim AirportTractive mobile elevatorWhat principles should be paid attention to in the selection



Heavy load capacity: protective plate form: 90° Or 180° Interchangeable configuration rocker working angle: 75° Drive method: hydraulic power unit drive or screw drive.

Sales Department.According to calculations when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.

When disassembling the hydraulic oil tank filler cap, filter cover, inspection hole, hydraulic oil pipe and other parts, it is necessary to avoid dust during the system oil passage. The disassembled parts must be thoroughly cleaned before opening. When disassembling the hydraulic oil tank filler cap, first remove the soil around the tank cap. After loosening the tank cap, remove any remaining debris from the joint area (do not rinse with water to prevent water from seeping into the tank). Only after confirming cleanliness can the tank cap be opened. When using materials and hammers, materials that do not remove fiber impurities and specialized hammers with rubber attached to the surface should be selected. Hydraulic components and hydraulic hoses should be carefully cleaned dried with high-pressure air, and then assembled. Choose a well packaged filter element (the inner packaging is damaged, although the filter element is intact, carefully clean the bottom dirt inside the filter housing with materials.

Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

Munich Lim Airport.Heavy load capacity: protective plate form: 90° Or 180° Interchangeable configuration rocker working angle: 75° Drive method: hydraulic power unit drive or screw drive.

Firstly clean the filter at the same time. Before installing the filter element, it is necessary to start from the source. The current technology is relatively advanced. When manufacturing aluminum alloy lifting platforms, adding chromium, nickel etc. to ordinary steel to make stainless steel, changing the internal structure of the metal to prevent rust.

According to calculations,Munich Lim AirportLarge mobile lifting platform, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.