Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, shallow foundation pit required, large stroke, stable operation, low noise accurate positioning, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table,SofiaLEGO Electric Elevator, resulting in a safety clamp. To prevent breakage of the lifting wire rope. A safety clamp that can simultaneously cut off the power supply and stop the car from falling should be removed from the car. A car without safety tongs is not allowed to ride or carry people. If it is a simple electric elevator, there should be a safety device (such as a safety stop pin) to prevent people from suddenly falling when loading and unloading goods in the car; Electric elevators with three or more floors (including three floors) for passengers or passengers.

Sofia.It is strictly prohibited to use travel limit switches as switches to stop operation.

Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

In order to meet the needs of contemporary audiences and achieve perfect effects, in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, there are suspension rods, suspension points, lighting bridges, lighting suspension cages, and fire curtains. Under the stage, car platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, dance theaters, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage craft layout, meeting the needs of stage design and choreographers, creating special atmosphere and effects, and changing the stage form according to the needs of the performance.

Setting requirements: Before starting work every day and changing shifts, record the inspection results, and report any problems found to the user unit.


SofiaSecond floor electric elevatorWhat are the production characteristics of



When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

The top of the hanging cage is accessible; d) During installation/disassembly/maintenance/inspection of the device; e) Inside the hanging cage.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Variable cost.Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.

Setting requirements: The landing door should be standardized and tooled.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors,SofiaBackground axis electric elevator, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.


SofiaSecond floor electric elevatorWhat are the production characteristics of



Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

Statistics.Every theater is a public place with a large number of people and safety considerations should be taken into account in stage design. According to relevant national regulations,SofiaElectric self-propelled elevator, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.

Before each shift of work, the safety devices of the construction electric elevator should be inspected to ensure sensitivity and reliability.

Setting requirements: For construction electric elevators that operate in multiple shifts the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Sofia.Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.