StrasbourgDesign of boarding bridgeMarket price continued to rise

announcer:hp161HP196399230 release time:2024-05-31 12:01:34

StrasbourgMobile Yard Ramps ,

Do you know some of the working characteristics of hydraulic lifting boarding bridges? Today, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.

Strasbourg.Mobile boarding bridge is a cargo loading and unloading auxiliary equipment used in conjunction with forklifts, which can adjust the height according to the height of the car carriage. Forklifts can directly enter the interior of the carriage for batch loading and unloading of goods, and can achieve rapid loading and unloading of goods with only one person working. It enables enterprises to reduce a large amount of labor, improve work efficiency, and obtain greater economic benefits.

Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and there is basically no change to the building structure.

It is strictly prohibited to apply excessive pile loads around the foundation pit.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.


StrasbourgDesign of boarding bridgeMarket price continued to rise



During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

Home page recommendation.Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

After the boarding bridge work is completed all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

These are the options for hydraulic oil for mobile boarding bridges.


StrasbourgDesign of boarding bridgeMarket price continued to rise



The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

For more, please check.For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, such as working in highly corrosive, dusty, high-temperature, and low-temperature environments.

As we all know

Strasbourg.Tighten the manual valve to close it.

  1. Before use check the boarding bridge for obvious damage such as cracks and broken wires.

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time,StrasbourgHydraulic flow boarding bridge, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.