announcer:hp935HP175192871 release time:2024-05-29 10:07:24

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Iseron.And prevent it from starting normally. There should be no device that allows users to cancel warning signals.

The counterweight guide rail should meet the specification requirements.

.Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform,IseronElectric hydraulic elevator, and the lifting of goods should try to maintain a stable and uniform speed.

Emergency manual valve: In case of power failure it can cause the car to descend to the nearest floor position and open the door

Emergency manual valve: In case of power failure,IseronElectric elevator mobile type, it can cause the car to descend to the nearest floor position and open the door


IseronIndoor electric elevatorAgent



Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Non automatic reset upper and lower limit switches should be installed at both the upper and lower ends of the stroke,IseronElectric fork lift table, which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers),

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

Affordable price.The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring and oil cylinder once a week to avoid dust and debris affecting normal operation.


IseronIndoor electric elevatorAgent



Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

safety requirements .The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

Platform.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Iseron.Setting requirements: The landing door should be standardized and tooled.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts