Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, remove any obstacles or debris near the electric elevator that may hinder operation,TodelgekoElectric elevator,TodelgekoElectric small mobile elevator, and check whether the operating handle can be used normally.

From the perspective of the safety performance of the machinery itself, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

.The counterweight guide rail should meet the specification requirements.

Mechanical devices controlled by cage movement should not be used to open or close the landing door.

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.


TodelgekoHand push electric elevatorBuying is good to choose factory direct purchase



Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

Precautions during operation: Mechanical operations should be gentle and smooth, and mechanical operations should be avoided, otherwise impact loads will inevitably occur, causing frequent mechanical failures and greatly shortening the service life. Generated during homework

When the wall bracket adopts non matching standard products, design calculations should be carried out.

Test conclusion.Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.


TodelgekoHand push electric elevatorBuying is good to choose factory direct purchase



Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

production costs.To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

There is a certain itinerary.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Todelgeko.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver,Todelgeko22ov electric elevator, the landing door shall not be opened.

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.