HanshanElectric hydraulic elevatorThe environment promotes the help of enterprises

announcer:hp935HP175192871 release time:2024-05-26 16:05:05

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

When the wall bracket adopts non matching standard products, design calculations should be carried out.

Hanshan.The detailed reason why water cannot be used to flush the hydraulic station is that doing so will corrode the oil tank in the hydraulic station, and once water is mixed in the hydraulic station, the damage to the hydraulic system is very large. Therefore, it will simply form pipeline corrosion, water vaporization, and other phenomena that can cause adverse effects or results for hydraulic electric elevators. Therefore, it is necessary to prevent such actions to ensure the normal operation and service life of the hydraulic station.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

.When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

The safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation should not be less than 0.75m; If the rated speed is not greater than 0.7m/s, the safety distance can be 0.40m.


HanshanElectric hydraulic elevatorThe environment promotes the help of enterprises



The use of a lifting platform as a tool for storing performance blankets,HanshanElectric chain elevator, etc. In some theaters,Hanshan2 meter electric elevator, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.

The impact load can cause early wear, fracture, as well as generate impact pressure in the hydraulic system, which in turn can damage hydraulic components, oil seals and high-pressure oil

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Welcome to inquire.Implementing multiple shifts of homework should fill in and submit records according to regulations.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door


HanshanElectric hydraulic elevatorThe environment promotes the help of enterprises



Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.

Potential development.Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts it is advisable to place the screw at the bottom and the nut at the top.

Electric elevators should be regularly maintained and cleaned. During maintenance and cleaning, the bracket should be supported to prevent the electric elevator from overturning. Electrical and hydraulic systems should be maintained by professional personnel; When the battery level display is less than 40%

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise long service life, large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.

Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances,HanshanFlagpole electric elevator, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)