lush mountainElectric scissor type lifting platformStrengthen process control and promote production

announcer:hp935HP175192871 release time:2024-05-26 15:50:49

Setting requirements: The landing door should be standardized and tooled.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

lush mountain.Check the starter potential when the lifting table is not raised or the voltage is too low when the motor load is working. Voltage hydraulic range allowed&

When the wall bracket adopts non matching standard products, design calculations should be carried out.

.Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.


lush mountainElectric scissor type lifting platformStrengthen process control and promote production



The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Setting requirements: Construction electric elevators should be equipped with up travel (limit) switches.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Scheme customization.The setting of the cable guide frame should comply with the user manual and regulatory requirements.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

During loading and unloading, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

A lifting platform with specifications ranging in height from 1 meter to 20 meters.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

lush mountain.News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform,lush mountainFolding electric elevator, and high load-bearing capacity, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into 24V, 220V or 380V power supplies diesel engines, using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates,lush mountainTwo phase electric elevator, which have anti slip, insulation, and safety features. Please rest assured to use.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.