Iron sheetTransformer temperature in high voltage distribution roomWhy does the air volume become smaller after using it for a long time

announcer:hp122HP117294921 release time:2024-05-14 20:18:19

Seal oil leakage

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface,Iron sheetDifference between rectifier transformer and power transformer, and then tighten it after wiping the raw materials on the surface. After drying the treatment goal can be achieved.

Iron sheet.The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.

.The noise of dry-type transformer comes from

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.


Iron sheetTransformer temperature in high voltage distribution roomWhy does the air volume become smaller after using it for a long time



Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.

The insulation of the through core anchor bolt clamping the iron core is damaged, and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring,Iron sheetModel of three-phase oil immersed transformer, and D (or D) is triangular wiring.

original.Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.


Iron sheetTransformer temperature in high voltage distribution roomWhy does the air volume become smaller after using it for a long time



Performance and main parameters of common metal composites, various welding processes and machinery and equipment preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser,Iron sheetPower system transformer, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, general installation process vacuum pump oil immersion, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

Iron sheet.How to reduce the failure of dry-type transformer?

On load commissioning:

It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.