Ashburn10 meter electric lifting platformAnalysis and design process and requirements

announcer:hp935HP175192871 release time:2024-05-13 16:00:49

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Ashburn.Construction electric elevators should be equipped with emergency stop switches and comply with regulatory requirements.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications,AshburnElectric fork lift table, as specified in the above table.

.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station and the landing doors should function properly.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)


Ashburn10 meter electric lifting platformAnalysis and design process and requirements



When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

Items and other miscellaneous items.

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

ranking.In addition to ground protective fences,AshburnSmall electric hydraulic elevator, a half height middle crossbar, and a toe board at least 150mm above the ground.

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.


Ashburn10 meter electric lifting platformAnalysis and design process and requirements



As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points, and can be controlled up and down floors to achieve safe use.

Potential development.Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

The safety overtravel of limit switches and upper limit switches should comply with regulatory requirements.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

Ashburn.Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

To ensure safe and reliable braking of the lifting platform and prevent accidents, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.