The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

Before no-load impact closing,JonkielVariable frequency power transformer, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

Jonkiel.The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, two pumps are started separately, and each pump is driven by 100kW motor, so the usual load is 200 KW, CST = 0. One 750kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only 34%

With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

.Then clamp the branch pipe with your thumb clearly put forward the glass test tube, carry out it twice rotate and release the oil in the tube to clean the sampling tube, and then draw the oil sample.

The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, the disconnection component of the electric field is small.

Dry type transformer factory


JonkielOperating temperature of oil immersed transformerSurface corrosion treatment method



Power transformer

The proper selection of Anhui dry-type transformer has a key effect on improving the safety and smooth operation of power system software. In the above original text, we have already mastered the structure and characteristics of dry-type transformer. In this part, we will describe how to select dry-type transformer according to the load characteristics and application environment of dry-type transformer.

In the case of using dry-type transformer, customers must master the method of wiring. If there are problems in wiring, it is easy to cause common faults in application. So, what is the wiring mode of dry-type transformer?

Product line.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

Before no-load impulse closing, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

How to reduce the failure of dry-type transformer?


JonkielOperating temperature of oil immersed transformerSurface corrosion treatment method



When sampling in bulk gasoline barrels,JonkielBox buried transformer,JonkielPrice of 2000kVA dry type transformer, samples shall be selected according to 5% of the number of gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

Finance Department.The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by 100kW motor, so the usual load is 200 KW, CST = 0. One 750kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only 34%

Oil leakage at looper flange

Jonkiel.Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.

Oil leakage of heat pipe radiator

35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.