BaileAtha ISimple electric hoist cargo elevatormarket

announcer:hp935HP175192871 release time:2024-05-08 09:56:45

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

BaileAtha I.Fully autonomous lifting is widely used in various high-altitude work fields, such as factory maintenance, the operating failure rate can be reduced to a low level.

.The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator and so on; How to use electric elevators correctly to extend the service life of the equipment and be flexible

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods street light maintenance, making high-altitude operations easier

The quality of the standard section should comply with the product manual and specification requirements.


BaileAtha ISimple electric hoist cargo elevatormarket



Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

The downward movement of the hydraulic cylinder (i.e. heavy object lowering). The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder passes through the balance valve, hydraulic control one-way valve, energy-saving valve, and explosion-proof electric valve

For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

Variable cost.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.


BaileAtha ISimple electric hoist cargo elevatormarket



From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life, large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.

Honesty is the foundation.The motor of the hydraulic guide rail lifting platform is set around the wellbore, improving the utilization rate of the wellbore area.

Construction electric elevators should be equipped with safety devices to prevent the cage from falling. The anti fall safety device should be functional at all times, including installation, disassembly, and before resetting after action. Fall arrest safety gear

The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts,BaileAtha IElectric elevator, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

BaileAtha I.The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform,BaileAtha IScissor fork electric lifting platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer