When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,

In relay protection dry-type transformer the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuit

Phoenix.Maintenance contents of power transformer

Power transformer factory

.Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.

(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than 1m; At the angle with actual operation,PhoenixTransformer series, a spacing of more than 2m shall be reserved; If metal fence is selected,PhoenixTransformer power transmission and ignition, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

When the output power P2 of the transformer is equivalent to the input power P1, the transformer will not cause loss. But in fact, there is no such transformer. The electromagnetic energy of transformer always causes loss. The key of this kind of loss is copper loss and iron loss. Copper loss refers to the loss caused by the number of turns of transformer coil. When the current has a fever according to the number of turns of the coil, part of the electromagnetic energy changes into energy and is lost. Because the electromagnetic coil is generally wound by copper core wire with insulating layer, it is called copper loss.

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

Installation requirements.For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage,Phoenix500 kV oil immersed transformer, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

Power transformer plant

The oil in the machinery and equipment of the oil storage tank shall generally stand for more than 8h before sampling; it is not necessary to stand when sampling on the running power transformer.


PhoenixPower tubeKey production technology



When the full load test is carried out and everything is normal, the load can be connected.

quality standard.Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.

Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.

Equipped with a temperature controller, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.

Phoenix.Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

When the full load test is carried out and everything is normal, the load can be connected.