Elura Dry type transformer designSelection considerations

announcer:hp122HP117294921 release time:2024-05-03 11:12:03

and the vibration reduction solution is made at the cable bridge.

Dry type transformer

Elura .The secondary inductive equipment of the distribution station (such as transformer

The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, voltage transformer, automobile relay, AC, etc.) operates normally. According to the AC current, the winding transformer core will send out a symmetrical rhythm and a certain tone & ldquo; Buzz, buzz & rdquo; Sound. The operation staff of the transformer manufacturer should understand and grasp the characteristics of the noise. When the equipment has common faults, there will be noise and even & ldquo; Crackle & rdquo; The charging and discharging sound can distinguish the generation and characteristics of common equipment faults according to the music law and sound transformation when everything is normal and abnormal.

The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

.The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of 0.5kg or 1kg. 2-3 bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling person, weather conditions and other materials of the oil sample.

The method and whole process of taking oil sample of power transformer are as follows:


Elura Dry type transformer designSelection considerations



After no-load test run is normal for 24h,Elura Price list of power transformer, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

If the input of dry-type transformer is an alternating switching power supply, its output voltage is directly proportional to the coil turn ratio of the output input solenoid coil. If a rechargeable battery is used, because it is DC, add a circuit in the input power supply circuit to change it into a continuously changing voltage. In that way, the alternating DC current can be obtained at the output end.

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked,Elura S11 type oil immersed transformer, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

Installation conditions.Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;

Dry type transformer company

(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.


Elura Dry type transformer designSelection considerations



The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line it will be grounded from the surrounding grounding body.

Which one is better.Falling foreign matters and piercing

Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.

In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.

Elura .Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.

Solenoid insulation deterioration

In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.