LincolnStage style lifting platformThe molding process is different

announcer:hp275HP127226562 release time:2024-05-02 11:46:47

Vibration aging treatment and effect judgment: According to the aging process plan, after setting the support points and vibration pickup points of the workpiece, use a rigid fixture to fix the exciter on the workpiece, and use the manual function of the equipment to test the vibration. It is determined that around 5300 revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat, so the excitation force is selected as the fourth gear.

Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

Lincoln.All connecting shafts must have split pins and be sufficient.

Emergency descent: Handle operation or use of manual pressure relief and activation of emergency battery system to implement emergency descent function safety net.

.However, large welded structural components have the characteristics of complex morphology, large weight, large differences in residual stress size and distribution, they found Nanjing Juhang and our JH-700 vibration aging equipment, the equipment prints the vibration aging curve online. According to the curve, the front end of the a-t curve shows an upward trend, indicating that the damping inside the component decreases after vibration treatment,LincolnScissor fork type mobile lifting platform, so the amplitude gradually increases; Since then the amplitude change has been basically stable, indicating that the structure of molecules inside the component tends to be stable, which conforms to the judgment standard of curve observation strip, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation, and hang it in a prominent position. When working on an electric lifting platform, professional drivers and operators must be equipped, and they must undergo specialized training and be qualified. They must hold relevant certificates and take on corresponding responsibilities according to the actual situation of the work. After the construction is completed, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, zy12 drivers must carefully check the electrical, hydraulic, and mechanical systems of the platform, check the working range of the lifting platform truck, and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

According to GB/T25712-2010, when one of the following situations occurs in the curve related to the aging frequency, it can be determined that the area covered by the effective zone of the vibration mode at that frequency has reached the aging effect: the curve rises and flattens; The curve rises, then falls, and then flattens; The resonance frequency of the a-n curve after vibration is lower than that before vibration; The bandwidth of the a-n curve after vibration narrows compared to before vibration; The resonance peak of the a-n curve after vibration exhibits fission phenomenon; The curve flattens out after descent.


LincolnStage style lifting platformThe molding process is different



Heavy load capacity: protective plate form: 90° Or 180° Interchangeable configuration rocker working angle: 75° Drive method: hydraulic power unit drive or screw drive.

The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit mainly consists of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity, and the lifting cage and driving mechanism are installed in the guide rail frame respectively, and the two are connected. Starting from adjusting the driving mechanism, power on the suspension cage until it rises 1m above the ground or detaches from the ground buffer spring (or support), the adjustment and sequence are as follows: 1. Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to maintain the installation surface of the mechanism perpendicular to the horizontal plane, and make the upper and lower pendulum wheels evenly guide the rails at the same time. Rotate each wheel body by hand to check if it evenly presses the rails; 2. Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to 0.2; Between 0.5mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of 0.2-0.5 ram with the guide rail; 4. Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than 85% of the surface of the gear rack. The smaller the area, the easier it is to damage the gears and racks.

Applicable environment: Indoor or outdoor Applicable temperature: Safety device Safety rocker: When the equipment is running and rising, which is used to measure the vibration amplitude of the workpiece. According to GB/T25712-2010, the acceleration sensor should be placed on the workpiece with a certain rigidity and a large amplitude, and its testing direction should be adjusted to be perpendicular to the plane where the effective zone of the vibration mode is located. Considering the complex structure of the lifting foundation workpiece and the uneven thickness of each component, the vibration pickup point is set in a thick area in the middle of the component.

The second method is the protective layer method, which covers the metal surface of the aluminum alloy lifting platform with a protective layer to isolate the metal products from the surrounding corrosive medium and prevent corrosion. Apply engine oil, petroleum jelly, paint, or cover the surface of steel parts with corrosion-resistant non-metallic materials such as enamel and plastic; Using electroplating hot plating, spray plating, etc., to coat the surface of steel with a layer that is not easily corroded

Vibration aging treatment and effect judgment: According to the aging process plan, after setting the support points and vibration pickup points of the workpiece, use a rigid fixture to fix the exciter on the workpiece, and use the manual function of the equipment to test the vibration. It is determined that around 5300 revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat, so the excitation force is selected as the fourth gear.


LincolnStage style lifting platformThe molding process is different



Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

system.02 The lifting platform adopts a fully hydraulic lifting mechanism,LincolnGuide rail type lifting platform, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device, In order to ensure the safety of operators, each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands, and the power of the entire vehicle 09 is a diesel engine with its own power supply. The power supply can also be used. The hydraulic lifting platform is equipped with an emergency lowering device in case of power outage. The 11 folding arm lifting platform product can also use a 50Hz, 380V power motor, and diesel engine dual power.

With the continuous development of the economy,LincolnMobile boarding bridge manufacturer, meeting the needs of society, and increasing productivity, hydraulic cargo elevators play an important role in high-altitude operations. Hydraulic cargo elevators operate up and down, and can provide us with a safe and stable platform. We can provide security for our safety when working at heights.

Outdoor guide rail lifting platform, mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and an elevation of 1-25 meters, guide rail elevators, also known as hydraulic elevators, can be installed indoors and outdoors. They have a high lifting height and use side mounted oil cylinders, ensuring smooth operation, low noise, convenient maintenance, and long service life. In case of power failure manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm. Professional elevator manufacturers have high pressure resistance, good waterproof performance, and fire and high temperature resistance, Strong overload capacity, corrosion resistance, radiation resistance, long service life. The top layer height is not affected and can be customized according to the on-site environment. It is suitable for 2-3 story steel structures or concrete factories, and can be used both internally and externally.

Lincoln.Low failure rate: Due to the use of advanced hydraulic systems and good methods, it is driven by the pressure generated by its own weight, which greatly saves energy.

The design of support points for selecting process parameters is to avoid energy consumption and noise generation due to collision between components and supports during vibration. The supports should be arranged near the nodal line, and the layout principle is: when the aspect ratio of the component is greater than 2, two point supports can be used; When the aspect ratio is close to 1, it is advisable to use or 4-point support.

Emergency stop: Press the emergency button switch to raise or lower the machine.