Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening,HaizhouTen meter electric elevator, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Haizhou.Setting requirements: A limit switch should be set at both the upper and lower ends of the stroke, which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers), so that the suspension cage can stop

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

.Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Then, the lifting platform platform platform that carries the load needs to be balanced, and the lifting of goods should try to maintain a stable and uniform speed.

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.


HaizhouFully automatic electric elevatorTechnological innovation ecosystem



Every theater is a public place with a large number of people, and safety considerations should be taken into account in stage design. According to relevant national regulations,HaizhouElectric elevator, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.

If the set screw is loose, be sure to pin it tightly to prevent accidents caused by the shaft pin falling off. Hydraulic oil should be kept clean and replaced every 6 months.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

How much is it.With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.


HaizhouFully automatic electric elevatorTechnological innovation ecosystem



When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

Installation materials.The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

When charging, it is necessary to charge it in a timely manner. When the equipment is used for about 2 months (according to the actual frequency of use), it is necessary to add grease to the rotating parts once; Regularly inspect the working status of the pin shaft of the fully self-propelled electric elevator every month, and if any pin shaft is found

News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

Haizhou.Work is essential, and the main protective accessories include safety belts,Haizhou3 meter electric elevator, guardrails, protective covers platforms and stairs, it can automatically cut off the oil circuit and stop descent