The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak,Bissau Transformer energy, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

Bissau .The cycle time of power-off cleaning and inspection shall be determined according to the surrounding environment and load conditions, generally from half a year to once a year;

If you want to check the activated carbon fiber for the hanging cover,Bissau Oil immersed high voltage test transformer, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes and count the spacing and specifications for easy reinstallation. At the same time, stop the lifting,Bissau 10kV dry type transformer scb12, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.

.& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

In specific daily life, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.

The main reason is that the welding quality of electric welding is poor, there are empty welding open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.


Bissau Price of dry type 800kVA transformerBriefly describe daily failures and solutions



The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.

It should be said that after the development trend of these years, the overall level of China's transformer industry at this stage is basically international, and the quality level is no different from that of overseas goods& rdquo; The person in charge of the transformer Federation of China Household Appliance Industry Association said.

Oil leakage at electric welding position

supply.When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, and can be solved until power failure.

The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.

Noise solution of dry-type transformer


Bissau Price of dry type 800kVA transformerBriefly describe daily failures and solutions



Fault judgment of power transformer

Workshop cost.Oil leakage of heat pipe radiator

Dry type transformer, a static electrical equipment, is used to change the AC current (current) of a certain standard value into another or several types of working voltage (current) with the same frequency and different standard values. According to the supervision sampling inspection data of the third quarter of last year released by AQSIQ, among the 29 kinds of dry-type transformer commodities manufactured by 29 manufacturers in 12 provinces and municipal districts across the country, 6 kinds of commodities were found to be inconsistent with the provisions of relevant specifications, with a compliance rate of 80%& ldquo; This result mostly shows the quality level of China's dry-type transformer industry at the present stage.

Wiring mode of dry-type transformer:

Bissau .In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.

Power transformer factory

Oil leakage at looper flange