Antibes2 meter high electric elevatorLate price fluctuations

announcer:hp935HP175192871 release time:2024-04-24 10:46:20

The wall bracket of the construction electric elevator should be intact and reliably fixed and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings, a half height middle crossbar, and a toe board at least 150mm above the ground.

Antibes.The cleanliness of the hydraulic station is an important aspect of the electric elevator hydraulic station, so it should not be taken lightly. And from a professional perspective, there are relevant rules and requirements that should be referred to in the specification manual, so as to have a correct understanding and know how to achieve good cleanliness.

Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

.Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.


Antibes2 meter high electric elevatorLate price fluctuations



The counterweight guide rail should meet the specification requirements.

The movement of its related components is direct.

Use floor doors and cage door devices on construction sites where conditions permit.

Installation requirements.The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, it is allowed to lower the height of the lower door opening,AntibesElectric banner elevator, but in any case the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above,AntibesFour wheel electric elevator, effective protective measures should be taken.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)


Antibes2 meter high electric elevatorLate price fluctuations



Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, shallow foundation pit required, large stroke, stable operation, low noise, accurate positioning, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table,AntibesElectric rope climbing machine elevator, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

The top of the hanging cage is accessible; d) During installation/disassembly/maintenance/inspection of the device; e) Inside the hanging cage.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Antibes.Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.