Jade SpringTen meter electric elevatorTrend forecast

announcer:hp935HP175192871 release time:2024-04-19 11:00:46

Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

When the landing door is closed, the full width of the lifting passage opening should be covered.

Jade Spring.The usual operation of landing and docking. The installation position of the upper limit switch should comply with the following: when the lifting speed is less than 0.8m/s, the upper safety distance L left after the upper limit switch is triggered by the hanging cage should not be less than

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures the side protection device for the landing entrance should be equipped.

.Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

Setting requirements: The landing door should be standardized and tooled.


Jade SpringTen meter electric elevatorTrend forecast



Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

And prevent it from starting normally. There should be no device that allows users to cancel warning signals.

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

High value.Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, Terrace, Tower, Pavilion; Ideal props.

Implementing multiple shifts of homework should fill in and submit records according to regulations.


Jade SpringTen meter electric elevatorTrend forecast



The quality of the standard section should comply with the product manual and specification requirements.

plan.Acceptance: Concrete strength grade C30, strength testing report.

Safety devices: Electric elevators for construction should be equipped with overload detection devices. When the load inside the cage exceeds 10% of the rated load capacity, the overload detection device will give a warning signal inside the cage,Jade SpringElectric portable elevator,

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

Jade Spring.It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts,Jade SpringPure electric curved arm elevator,Jade SpringElectric 6-meter elevator, it is advisable to place the screw at the bottom and the nut at the top.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.