EggerElectric spiral rod elevatorHow to deal with the value of cranes encountering heatstroke

announcer:hp935HP175192871 release time:2024-04-17 12:28:27

Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Egger.Limit switches should be triggered directly by the movement of the suspension cage or its related components.

There is no need to set up a computer room above the shaft like an elevator, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

Use floor doors and cage door devices on construction sites where conditions permit.


EggerElectric spiral rod elevatorHow to deal with the value of cranes encountering heatstroke



Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength,EggerElectric belt elevator,Egger4 meter high electric elevator,EggerUsed electric elevator, stability, etc., and the production should meet the design requirements.

Promise and keep promise.Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.


EggerElectric spiral rod elevatorHow to deal with the value of cranes encountering heatstroke



News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

Word of mouth recommendation.Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

Pole

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.

Egger.The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

Use floor doors and cage door devices on construction sites where conditions permit.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.