announcer:hp935HP175192871 release time:2024-04-17 11:37:50

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Zhongshan.The downward movement of the hydraulic cylinder (i.e. heavy object lowering). The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder passes through the balance valve, hydraulic control one-way valve, energy-saving valve, and explosion-proof electric valve

Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear, deformation, and corrosion of steel wire ropes

.Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Before installation the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.


ZhongshanSelf propelled electric elevatorhow to use



Mechanical devices controlled by cage movement should not be used to open or close the landing door.

Check the starter potential when the lifting table is not raised or the voltage is too low when the motor load is working. Voltage hydraulic range allowed&

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Pursuit of excellence.Horizontal lead screw mechanical electricity

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

During normal operation, measures should be taken to make it meet the requirements,ZhongshanFixed electric elevator,ZhongshanElectric water gate elevator, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.

Unloading platform and attached electric construction platform, etc.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Zhongshan.The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Before installation, the installation unit should confirm that the foundation, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

Once again,ZhongshanElectric high-altitude elevator, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.