Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.

Before installation,WehrovoFolding electric elevator, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and concrete strength report.

Wehrovo.Setting requirements: A limit switch should be set at both the upper and lower ends of the stroke, which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers), so that the suspension cage can stop

Before installation, the installation unit should confirm that the foundation,WehrovoSmall electric winch elevator, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

.Installation and dismantling personnel and drivers should hold certificates to work.

Spiral electric lifting mechanism: With all the functions of a regular lifting platform the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.


WehrovoElectric belt elevatorWhat is the difference in construction process



Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.

Lower limit switch: In normal working state, before the suspension cage touches the buffer,WehrovoElectric small elevator, the lower limit switch first acts.

Protective measures should comply with regulatory requirements.

Quality assurance.Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results and report any problems found to the user unit.

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

When the wall bracket adopts non matching standard products, design calculations should be carried out.


WehrovoElectric belt elevatorWhat is the difference in construction process



The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

Direct material.Protective measures should comply with regulatory requirements.

Lower limit switch: In normal working state, before the suspension cage touches the buffer, the lower limit switch first acts.

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

Wehrovo.Electric elevators used in various places.

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test it worked normally.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.