LeipzigTraction lifting platformThe stability is affected by the slide rail

announcer:hp275HP127226562 release time:2024-04-16 09:54:50

LeipzigAluminum alloy automatic lifting platform,

Low failure rate: Due to the use of advanced hydraulic systems and good methods, the failure rate of elevator operation can be minimized. Low power consumption: When the hydraulic elevator descends it is driven by the pressure generated by its own weight, which greatly saves energy.

02 The lifting platform adopts a fully hydraulic lifting mechanism, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device, In order to ensure the safety of operators, each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands,Leipzig8 ton movable boarding bridge, and the power of the entire vehicle 09 is a diesel engine with its own power supply. The power supply can also be used. The hydraulic lifting platform is equipped with an emergency lowering device in case of power outage. The 11 folding arm lifting platform product can also use a 50Hz, 380V power motor, and diesel engine dual power.

Leipzig.  ?? The supervision unit shall effectively fulfill its safety responsibilities, it shall require the installation unit and the user unit to rectify within a specified period of time. If the installation unit and the user unit refuse to rectify, they shall promptly report to the construction unit

Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.

.Emergency stop: Press the emergency button switch to raise or lower the machine.

Outdoor guide rail lifting platform, guide rail elevators, also known as hydraulic elevators, can be installed indoors and outdoors. They have a high lifting height and use side mounted oil cylinders, ensuring smooth operation, low noise, convenient maintenance, and long service life. In case of power failure, manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm. Professional elevator manufacturers have high pressure resistance, good waterproof performance, and fire and high temperature resistance, corrosion resistance, radiation resistance long service life. The top layer height is not affected, and can be used both internally and externally.

When the lifting base plate descends and can be customized according to the on-site environment. It is suitable for 2-3 story steel structures or concrete factories, the safety net below immediately stops running and descends when encountering obstacles.


LeipzigTraction lifting platformThe stability is affected by the slide rail



Outbound call form: Outbound call boxes are pre embedded or installed in a column style on the wall or ground near the parking floor above and below the platform, and are linked to operate the platform up and down.

Manganese steel is generally used as the primary profile for warehouse cargo elevators. In order to achieve better anti-corrosion effect, a layer of rust resistant primer is usually applied, which effectively blocks air and prevents premature corrosion of the steel. Below, Ruilong hydraulic press will explain the role of rust resistant primer.

Low failure rate: Due to the use of advanced hydraulic systems and good methods, the failure rate of elevator operation can be minimized. Low power consumption: When the hydraulic elevator descends, it is driven by the pressure generated by its own weight, which greatly saves energy.

Promotion.Jinchuang lifting platform product feature 01 is mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and a lifting height of 1-25 meters, a guide rail elevator, also known as a hydraulic elevator, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, which runs smoothly, has low noise, is convenient for maintenance, and has a long service life. In case of a power outage, manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm, and the top layer height is not affected, The 04 pump station can be customized according to the on-site environment, suitable for 2-3 floors of steel structures or concrete factories. Both the internal and external parts can be used. The 05 pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The 06 oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers, The oil leakage problem of components 07. The oil cylinder is built into the platform 08. The heavy-duty steel wire rope wheel or weighted special chain ensures safety 09. The automatic insurance during the lifting process ensures vehicle safety 10. The synchronous device during the lifting process ensures that the vehicle may not overturn 11. The alarm setting before falling to the ground ensures the safety of the operator 12. The chain or steel wire rope fracture protection device 13. The hydraulic system pressure loss prevention protection device 14. The elevator special flat layer permanent magnet switch is selected, The leveling effect is good. 15. The distance between heavy and empty loads is small, and the leveling accuracy is high. 16. Standard elevator boards, LCD display call boxes, relevant wiring harnesses, and connectors are selected. Beautiful appearance, easy operation, visual display of the position of the elevator car on the floor, wiring harness connected using connectors, with automatic and manual options.

Heavy load capacity: protective plate form: 90° Or 180° Interchangeable configuration rocker working angle: 75° Drive method: hydraulic power unit drive or screw drive.

Low failure rate: Due to the use of advanced hydraulic systems and good methods, the failure rate of elevator operation can be minimized. Low power consumption: When the hydraulic elevator descends,LeipzigSelf walking scissor fork lifting platform, it is driven by the pressure generated by its own weight, which greatly saves energy.


LeipzigTraction lifting platformThe stability is affected by the slide rail



The driver shall close and lock the movable doors at both ends of the protective fence before work, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, the emergency stop switch can be used to stop the platform. However, during normal operation, it is prohibited to use the emergency stop switch to stop the platform.

Quality recommendation.The design of support points for selecting process parameters is to avoid energy consumption and noise generation due to collision between components and supports during vibration. The supports should be arranged near the nodal line, and the layout principle is: when the aspect ratio of the component is greater than 2, two point supports can be used; When the aspect ratio is close to 1, it is advisable to use or 4-point support.

The wear rate is fast, and due to factors such as processing, assembly, and adjustment of new machine components, the friction surface is rough, the mating surface area is small, and the surface pressure condition is uneven. During the operation of the machine, the concave and convex parts on the surface of the parts are intertwined and rubbed against each other. The metal debris that falls off from the grinding process, in turn, acts as abrasive and continues to participate in friction further accelerating the wear of the mating surface of the parts. Therefore, during the running-in period, it is easy to cause wear on components (especially the mating surface), with a fast wear rate. At this point, if overloaded, it may cause damage to the components and lead to early failures.

The driver shall close and lock the movable doors at both ends of the protective fence before work, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, during normal operation, it is prohibited to use the emergency stop switch to stop the platform.

Leipzig.When the lifting base plate descends, the safety net below immediately stops running and descends when encountering obstacles.

Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat