Alice SpringQuotation of 315 KVA oil type transformerHow to choose the right one

announcer:hp122HP117294921 release time:2024-04-15 11:26:58

The raw materials of Fushi blue can be used for bonding,Alice SpringCode for installation of power transformers, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

Alice Spring.The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.

.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

Dry type transformer company

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a guardrail of no less than 7m shall be installed around it,Alice Spring2000 KVA dry type transformer, and a warning sign shall be hung at a prominent position.


Alice SpringQuotation of 315 KVA oil type transformerHow to choose the right one



In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuit

The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;

Manufacturing cost.The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

The method and whole process of taking oil sample of power transformer are as follows:

In specific daily life, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally,Alice Spring315 KVA oil immersed transformer, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.