NebidagSubstation transformerWhat

announcer:hp122HP117294921 release time:2024-04-13 10:27:30

Dry type transformer factory

The hanging core of dry-type transformer is a vital part

Nebidag.With Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.

There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.

.When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again,Nebidag2000 dry type transformer manufacturer, turn on the photo flash when it's light, and it's short when it's heavy. Therefore, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.

Dry type transformer manufacturer

Solenoid insulation deterioration


NebidagSubstation transformerWhat



For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

A kind of power engineering equipment that converts the working voltage and current according to the basic law of magnetic effect of current. In the whole process of power transmission and transformation of power engineering, it is necessary to carry out voltage transformation and blood pressure reduction according to the transformer to reduce the loss of electromagnetic energy in the whole process. Therefore, the power consumption of the processing plant is all connected with 10kV switching power supply, which is converted into bottom voltage electromagnetic energy through transformer.

For 630kVA power engineering transformer,NebidagS13 technical parameters of oil immersed transformer,NebidagTest standard for oil immersed transformers, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

quality.Dry type transformer

(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.


NebidagSubstation transformerWhat



During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side and then make the working voltage impulse closing.

Project scope.Protective measures for damping of dry-type transformer

The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask etc.

Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.

Nebidag.Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.

Noise solution of dry-type transformer

In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.