Ban PhatthayaS13-m-200 power transformerCreate high-quality industrial wire

announcer:hp122HP117294921 release time:2024-04-11 11:24:21

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

Ban Phatthaya.The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25% 50% and 75% by grade.

.(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

High voltage fuse of transformer breaks one phase;

In specific daily life,Ban PhatthayaHow much is a 100 KVA box transformer, we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?


Ban PhatthayaS13-m-200 power transformerCreate high-quality industrial wire



In the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.

The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by 100kW motor, so the usual load is 200 KW, CST = 0. One 750kva transformer was originally configured and the capacity utilization rate introduced by the transformer manufacturer is only 34%

Oil immersed transformer operation

Create brilliance.(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

When the screw of the through core extruder holding the iron core of the transformer is loose, or small metal materials fall into the transformer there are screw cap parts left on the iron core, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak,Ban PhatthayaDry type 1250kva transformer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.

When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.


Ban PhatthayaS13-m-200 power transformerCreate high-quality industrial wire



A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?

Administration.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, so as to achieve the pressure management of oil leakage.

Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches 155 ℃, the system software outputs the overtemperature alarm system; If the temperature rises to 170 ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, and the transformer shall be tripped quickly.

The noise of dry-type transformer comes from

Ban Phatthaya.Oil leakage of cast iron parts

When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing,Ban PhatthayaParameters of 1250kva oil immersed transformer, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.