CologneEmbedded boarding bridgeWhat are the precautions for operation

announcer:hp161HP196399230 release time:2024-04-06 10:55:36

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top,CologneHydraulic boarding bridge factory, surface,CologneManufacturing of boarding bridges, and foot of the slope, especially for the simple boarding bridge.

After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

Cologne.Straight arm aerial work platform vehicle.

After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.

The correct operation of the hydraulic boarding bridge is good maintenance, and how to operate it correctly. Let me briefly introduce the operating steps of the hydraulic boarding bridge, hoping to bring more help to everyone.

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.


CologneEmbedded boarding bridgeWhat are the precautions for operation



The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, and replace it if it is damaged or severely worn.

When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.

Quality inspection report.Monthly maintenance of hydraulic boarding bridges: check for wear on rollers, intermediate shafts and bearings, cylinder pins and bearings, boom hinge shafts and bearings, etc; The oil quality and level of hydraulic oil; The hydraulic boarding bridge should be raised throughout the entire process, and at this position, the hydraulic surface should be 40 to 50 millimeters higher than the bottom of the box. The hydraulic oil is darkened, sticky, or has foreign objects such as gravel. If found, it should be replaced in a timely manner; Add some oil to each part to extend the service life of the bearing. The hydraulic boarding bridge has a wide range of uses. Doing the above points well not only ensures your personal safety but also extends the service life of the equipment, making the boarding bridge better serve you.

The length of the electric hydraulic boarding bridge is generally about 10 meters,CologneBoarding axle brand, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.


CologneEmbedded boarding bridgeWhat are the precautions for operation



Open planning before placement makes it easy to clean up clutter.

Workshop cost.The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

Drain all the hydraulic oil in the oil tank, open the oil tank take out the oil suction filter, clean it, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

Shake the handle to raise the boarding bridge to the height of the container.

These are the options for hydraulic oil for mobile boarding bridges.