Jean Hara30 KVA three-phase transformerHow to check the accuracy of machining work

announcer:hp122HP117294921 release time:2024-04-03 12:29:16

Falling foreign matters and piercing

(IV) the transformer on the column shall be stable and firm,Jean HaraOil immersed transformer cooling fan, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

Jean Hara.Several detection methods for installing transformer

Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.

.Difference between dry-type transformer and oil immersed transformer:

Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.

The hanging core of dry-type transformer is a vital part


Jean Hara30 KVA three-phase transformerHow to check the accuracy of machining work



The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires,Jean HaraBox type transformer door, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.

The transformer manufacturer will introduce the efficiency of the transformer to you

Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.

Encyclopedic knowledge.Before application the sampling container shall be cleaned with vehicle gasoline, and then washed with tap water until it is not alkaline,Jean HaraPower transformer specification, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

Fault judgment of power transformer

Oil immersed transformer


Jean Hara30 KVA three-phase transformerHow to check the accuracy of machining work



It includes the performance and main uses of insulating layer materials, various insulating layer parts, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

Word of mouth recommendation.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.

Power transformer is indispensable for power stations and substations, but we must pay attention to many problems in the whole process of applying power transformer.

Wiring mode of dry-type transformer:

Jean Hara.Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

Causes of fire in power transformer

Sound in case of phase failure