During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

The wall bracket of the construction electric elevator should be intact and reliably fixed,MaslesElectric barrier free elevator, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

Masles..

Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

.Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, making high-altitude operations easier

The verticality of the guide rail frame should meet the requirements of the specifications.


MaslesElectric elevator batteryHow to achieve the desired efficiency



When the wall bracket adopts non matching standard products, design calculations should be carried out.

The top of the hanging cage is accessible; d) During installation/disassembly/maintenance/inspection of the device; e) Inside the hanging cage.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

Safety and health.Mechanical devices controlled by cage movement should not be used to open or close the landing door.

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

From the perspective of the safety performance of the machinery itself those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery


MaslesElectric elevator batteryHow to achieve the desired efficiency



After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit,MaslesElectric screw elevator, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

target.Setting requirements: The wall bracket should use the manufacturer's matching standard products.

The usual operation of landing and docking. The installation position of the upper limit switch should comply with the following: when the lifting speed is less than 0.8m/s,MaslesElectric brick elevator on construction site, the upper safety distance L left after the upper limit switch is triggered by the hanging cage should not be less than

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

Masles.The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.