EilatMaintenance items of oil immersed transformerProduction capacity growth has stalled

announcer:hp122HP117294921 release time:2024-03-30 10:51:10

The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

Eilat.The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness resistance to short-circuit faults, common faults and impact. The work is diligent.

.The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below 2000kVA and the working voltage is below 35KV, which also ensures the rated voltage of 110kV; Oil immersed transformers are generally suitable for distribution equipment.

The hanging core of dry-type transformer is a vital part

Oil immersed transformer company


EilatMaintenance items of oil immersed transformerProduction capacity growth has stalled



Dry type transformer manufacturer

Automatic system of centrifugal fan: measure the temperature data signal according to the PT100 thermistor temperature measuring resistor of the embedded parts at the hot part of the bottom pressure winding. The transformer load expands and the operating temperature increases. When the winding temperature reaches 110 ℃, the system software automatically starts the centrifugal fan for refrigeration; When the winding temperature is as low as 90 ℃, the system software will automatically terminate the centrifugal fan.

After no-load test run is normal for 24h, it can be transferred to on-load operation, 50% and 75% by grade.

project.After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.

Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.


EilatMaintenance items of oil immersed transformerProduction capacity growth has stalled



It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip,EilatMaximum temperature of oil immersed transformer, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

High value.The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong so that the bolts are not tightened well, resulting in oil leakage.

Transformer is

High voltage fuse of transformer breaks one phase;

Eilat.In the case of dry-type transformer operation, and some even cause noise,EilatDistribution transformer model, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.

Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.