TarantoFully electric self-propelled elevatorWholesale preferred

announcer:hp935HP175192871 release time:2024-03-29 09:20:37

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

Taranto.Degrees,Taranto6 meter high electric elevator, m/s.

Buffer. In order to increase the energy for the car to hit the top or sink to the bottom. Remove rubber or sponge from the buffer and cabin to increase their impact energy; Rope groove slipping and other accidents caused the car to suddenly fall, resulting in a safety clamp. To prevent breakage of the lifting wire rope. A safety clamp that can simultaneously cut off the power supply and stop the car from falling should be removed from the car. A car without safety tongs is not allowed to ride or carry people. If it is a simple electric elevator there should be a safety device (such as a safety stop pin) to prevent people from suddenly falling when loading and unloading goods in the car; Electric elevators with three or more floors (including three floors) for passengers or passengers.

.The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

The use of standard section connecting bolts should comply with the user manual and specification requirements.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.


TarantoFully electric self-propelled elevatorWholesale preferred



Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

Try to use this equipment in areas with wind force less than level five, and avoid using it when the wind force is too strong to avoid accidents.

The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

Lets see.The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Setting requirements: The landing door should be standardized and tooled.


TarantoFully electric self-propelled elevatorWholesale preferred



Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.

The movement of its related components is direct.

Construction electric elevators outside the lightning protection range

Taranto.Once again and safety considerations should be taken into account in stage design. According to relevant national regulations, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened,TarantoMobile electric hydraulic elevator, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring,Taranto3 meter electric elevator, and oil cylinder once a week to avoid dust and debris affecting normal operation.

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.