Roermond Hydraulic electric lifting platformSelection principle

announcer:hp78HP121928405 release time:2024-03-18 11:15:43

When installing, disassembling, and adjusting the exhibition organization, attention should be paid to ensuring that the center line of the exhibition organization reducer is parallel to the center line of the gear, and its meshing surface is not less than 70% and the meshing interval should be appropriate.

The key to using a hydraulic elevator during normal operation is to determine whether it is operating normally and whether there is noise based on its operating sound.

Roermond .The daily maintenance of guide rail type lifting equipment should pay attention to regular inspection and maintenance, eliminate hidden dangers,Roermond Hydraulic lift truck platform car, eliminate faults, and achieve these benefits for improving work efficiency,Roermond Price scissors hydraulic lifting platform, extending equipment service life, and ensuring the safety performance of the elevator.

The transportation equipment for lifting and unloading goods is mostly used for goods transportation between height differences in production lines, material loading and unloading, component lifting during large-scale equipment assembly,Roermond Fully automatic hydraulic lifting platform, fixed three-dimensional parking, and other places. So what is the new price for fixed elevators?

.Now we have an increasing demand for cargo elevators. Let me introduce the maintenance work of guide rail cargo elevators to you. When we use a guide rail elevator in our daily life, we need to regularly inspect, maintain, and maintain it. This not only extends the service life of the guide rail elevator, but also makes it more powerful when working! For example, the transmission part should have sufficient oil, repaired, or replaced. Mechanical bolts, especially parts that frequently vibrate, such as slewing bearings and lifting arm connecting bolts should be checked for looseness. If there is looseness, it must be tightened or replaced immediately. Below is an introduction to the 8 steps of maintenance: important maintenance work for guide rail elevators. Regularly check the tire pressure and bearing condition of the guide rail elevators to ensure they are in good condition; Regularly check whether the structure of the bracket and panel is in good condition, and add oil and grease to the bearings and components in a timely manner, once a month; Vulnerable parts must be regularly inspected, repaired, or replaced. Parts that frequently vibrate, such as bolts and slewing bearings, should be checked for looseness. If there is looseness, it must be tightened or replaced immediately.

For the introduction of daily maintenance of lifting cargo elevators, the brakes of each organization should usually be inspected and adjusted to ensure sensitivity and reliability. On the surface, there should be no dirt present. If there is any dirt, it must be washed off with gasoline or thinner.

It is good not to cover the car with clothes for high-altitude work vehicles. If the vehicle is parked outside in windy and rainy weather, the clothes will repeatedly slap the car paint, especially if the car is blowing sand on the clothes, it will draw many small scratches on the clothes, because over time, it will lead to black paint. In addition, when the wind does not directly spray powder or clean the mechanism on the sand, it should be washed with water and prevent the high-altitude work vehicle vacuum cleaner from scratching the sand particles on the paint surface.


Roermond Hydraulic electric lifting platformSelection principle



Each box, distribution box, etc. is usually kept clean and dust on electrical equipment should be quickly swept away.

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

When installing, disassembling, and adjusting the exhibition organization, and its meshing surface is not less than 70%, and the meshing interval should be appropriate.

Honesty is the foundation.Each department's electric brush should be kept clean, and the brush pressure should be adjusted to ensure that its area is not less than 50%

How to use a hydraulic elevator and whether the emergency stop device is effective is very important during use. If special circumstances arise, the emergency stop can be used. Therefore, before use, it is necessary to carefully check whether all items are normal and ensure the effectiveness of the braking device.

Now that you understand how to use a hydraulic lift, it provides us with a safe working environment for our operators, and improves the efficiency and quality of the lowering work.


Roermond Hydraulic electric lifting platformSelection principle



Precautions for elevator installation: Keep the access road of external construction elevators smooth and have sufficient parking space for equipment. When using a crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the crane.

new product.Attention should be paid to inspecting whether each steel wire rope has broken wires and loose strands. If it exceeds the relevant regulations, it must be replaced immediately. The care and maintenance of steel wire ropes should strictly follow the regulations.

Every month, it should be ensured to add butter twice to the transmission position where the grease nipple is located. For areas where butter cannot be added, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise, the emergency stop can be used. Therefore, before use, it is necessary to carefully check whether all items are normal and ensure the effectiveness of the braking device.

Roermond .What types of elevators are there? There are many types of such devices, such as fixed lifting devices and vehicle mounted lifting devices, which can be divided according to the form of movement. The so-called fixed lifting is generally installed in one place and fixed, and some large production lines need to lift the materials to a certain position when loading them, and then put them into production on the production line. A special lifting device needs to be fixed at a certain position on the production line.

Slow down the smoothness and hydraulic oil of various departments such as the gearbox, gearbox, and external meshing gears according to the requirements in the smoothness table.

Attention should be paid to inspecting whether each steel wire rope has broken wires and loose strands. If it exceeds the relevant regulations, it must be replaced immediately. The care and maintenance of steel wire ropes should strictly follow the regulations.