AscendNational standard for loss of oil immersed transformerPerformance and precautions when using

announcer:hp122HP117294921 release time:2024-03-15 14:57:12

If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.

Before and after sampling,AscendHandover test contents of dry-type transformer, clean the periphery of the sampling port with clean or hairless linen.

Ascend.It is understood that in China, transformers have experienced the whole process of replacing many series products such as sss11. As early as the middle and late 1980s, S7 Series lossless distribution transformers were selected in China to replace the high energy consumption transformers of jb1300-73 and jb500 - Specifications operating in the power network at that time. Since the 19th century, urban power grids have been transformed all over the country, and S9 series distribution transformers have been used to replace S7 Series. In recent years, S13 and S15 commodities are gradually selected in large quantities in the transformation of urban and rural power networks in China, and their full load loss is 50% - 80% less than that of S9 transformer.

The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of 0.5kg or 1kg. 2-3 bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, sampling date, sampling person, weather conditions and other materials of the oil sample.

.Oil leakage of cast iron parts

In fact ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.

After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.


AscendNational standard for loss of oil immersed transformerPerformance and precautions when using



Power transformer manufacturer

How is the quality level of dry-type transformer compared with foreign countries?

Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.

Test method.On load commissioning:

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.

Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.


AscendNational standard for loss of oil immersed transformerPerformance and precautions when using



Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, etc. with flexible connection, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

original.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

The fundamental reason for this kind of inaccuracy is that when the transformer & ldquo; Dalar trolley & rdquo; is considered according to the size of capacity utilization rate,AscendTypes of dry-type transformers,AscendPower supply transformer, the high-capacity transformer must be replaced by the small-capacity transformer with high utilization rate, and then the iron loss is considered and the copper loss is ignored. In fact, for a certain load, the active power loss of small capacity exceeds that of large capacity The active power loss of the transformer, so it consumes electromagnetic energy.

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment the output capacity can be increased by 20%.

Ascend.The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.